A great basketball floor is only as good as its installation, and the NB brand basketball court wooden floor has a strict, multi-step installation process that is followed exactly by every NB certified installation team around the world, ensuring that every single floor delivers the perfect performance that the brand is known for.
The process starts long before any wood is even unloaded at the venue: the NB technical team first visits the site to fully inspect the concrete subfloor, checking for flatness, moisture levels, and structural stability. If the concrete slab is not perfectly flat, they will do a full grinding and resurfacing process to fix any uneven spots, because even a tiny 2 millimeter dip in the concrete can create a noticeable dead spot in the playing surface above it. Next, they lay down a high-performance moisture barrier that prevents any moisture from the concrete from seeping up into the wood, protecting the NB basketball court wooden floor from warping due to hidden water damage. After that, the team installs the adjustable subfloor support system, carefully placing each rubber shock pad at the exact pre-calculated position that was designed for that specific venue’s size and use case. This step is done with extreme precision, because the exact placement of these pads is what creates the perfectly even shock absorption across every inch of the court. Only after the entire subfloor system is fully inspected and tested for flatness and stability do the technicians start laying down the hardwood planks. Each plank is carefully aligned and nailed down with specialized hidden fasteners that do not leave any visible holes on the surface of the floor, creating a completely smooth, seamless playing surface. Once all the planks are in place, the team sands the entire floor multiple times with progressively finer sandpaper, until the surface is perfectly smooth and every single plank is at the exact same height. Then they apply the six layers of NB’s signature surface coating, letting each layer fully cure in a temperature-controlled environment before applying the next one. The final step is a full performance test: the team uses specialized equipment to measure ball bounce, shock absorption, and surface friction at more than 100 different points across the entire NB brand basketball court wooden floor, to make sure every single area meets NB’s strict quality standards before the court is handed over to the client. This rigorous installation process can take anywhere from 7 to 14 days to complete, but the end result is a floor that is perfectly installed, perfectly flat, and ready to deliver decades of top performance.