Alright, folks, so I decided to tackle a project I’ve been putting off for ages – finally giving my home gym/occasional volleyball practice area a proper floor. I’d been making do with some old rubber mats, but it just wasn’t cutting it. I wanted something that felt solid, had some give for jumps, and, well, looked a heck of a lot better. After a bit of digging, I settled on a keel/sleeper system with wooden flooring. Here’s how the whole shebang went down.
The Planning Stage (aka Avoiding Disaster)
First things first, I needed a plan. I’m no carpenter, but I’m pretty handy with tools and I’ve learned that winging it usually ends in frustration and wasted materials. I measured the area (twice, because I always mess that up the first time) and sketched out a rough design. The basic idea is to build a framework of “sleepers” (the wooden beams) that would sit on the concrete floor, then attach the actual flooring planks to those.
I spent a good evening researching different wood types. I needed something durable enough for volleyball impacts but also didn’t want to break the bank. Ended up going with a decent quality, pre-finished engineered hardwood. It seemed like a good balance of cost, durability, and ease of installation.
Getting My Hands Dirty (aka The Build)
Step 1: The Keel/Sleeper System.
This was the foundation, literally. I bought a bunch of 2x4s (pressure-treated, since they’d be in contact with the concrete) and cut them to size according to my plan. I laid them out on the floor, spacing them evenly to support the flooring. This part took some fiddling – making sure everything was level and that the spacing was consistent.
- Used a level – a lot. Seriously, don’t skip this.
- Used construction adhesive to secure the sleepers to the concrete. This helps prevent shifting and adds some extra stability.
- I put the sleepers parrallel.
Step 2: Laying the Flooring.
Once the sleeper system was in place and the adhesive had dried, it was time for the fun part (or at least, the part that looked like progress). I started laying down the engineered hardwood planks, following the manufacturer’s instructions. They clicked together pretty easily, which was a relief.
- Used a rubber mallet to tap the planks together snugly.
- Left a small expansion gap around the perimeter of the room (wood expands and contracts with temperature changes, so you need to give it some room to breathe).
- Staggered the joints of the planks for a more natural look and added strength.
The Finishing Touches (aka Making it Pretty)
With the flooring down, it was just a matter of adding some finishing touches. I installed baseboards around the edges to cover the expansion gap and give it a clean look. I also gave the whole floor a good cleaning to remove any dust or debris.
The Result (aka Time to Play!)
Honestly, I’m pretty stoked with how it turned out. It’s a massive improvement over the old rubber mats. The floor feels solid underfoot, has a nice bit of give for jumps, and it looks fantastic. It actually feels like a real gym/practice space now. Now if adding the floor, improved my skills!
It was definitely a weekend project (more like two weekends, if I’m being honest), but it was totally worth the effort. If you’re thinking about doing something similar, I’d say go for it! Just make sure you plan it out, take your time, and don’t be afraid to ask for help if you get stuck. Good luck with your projects!