Alright, let me tell you about this flooring thing I just finished. The old floor, man, it was looking sad. Scratched up, worn out, just depressing to look at every day. Decided it was time for a change, something solid, you know? Wood flooring seemed like the way to go.

Getting Started – The Prep Work

First thing was clearing out the room. You forget how much stuff you own until you have to move every single piece. Took longer than I thought. Then, pulling up the old carpet… what a job. Dust everywhere. Found a few forgotten treasures under there, mostly dust bunnies and an old coin.

Got the wooden planks delivered. Stacked them in the room for a few days, they say you gotta let the wood get used to the house environment. Sounds fussy, but who am I to argue? Didn’t want gaps later.

Then came the tools. Had most of what I needed – saw, measuring tape, rubber mallet, tapping block. Had to buy some knee pads though. Trust me, essential gear. My knees aren’t what they used to be.

Laying it Down – The Actual “Dance”

This is where the real fun, or maybe the real work, began. I started along the longest wall, like the instructions suggested. Measure twice, cut once became my mantra. Though, honestly, sometimes it felt more like measure three times, cut, swear, measure again, cut again.

Clicking those planks together, it’s satisfying at first. Click, tap, next one. Click, tap. But doing it hunched over, shuffling along the floor… yeah, that’s where the “rubber dancing” part comes in. It’s not graceful. Lots of kneeling, standing up, squatting down, awkward wiggles to get things lined up just right. My back definitely felt it the next day.

  • Laid down the underlayment first. That thin foamy stuff. Easy enough.
  • Started clicking the first row together. Had to use spacers against the wall.
  • Cutting the end pieces for each row was tricky. Getting that angle right, especially around the door frame, took some patience. My cheap saw wasn’t exactly precision engineering.
  • Staggering the joints is key, otherwise, it looks weird. Had to keep track of the offcuts to start the next rows. Tried to be efficient, like a proper engineer, minimizing waste.
  • Tapping the planks together gently with the mallet and block. Not too hard, not too soft. It’s a feel thing.

The last row was a pain. Had to cut the planks lengthwise. Measuring that gap accurately when the wall isn’t perfectly straight… let’s just say there was some creative problem-solving involved. More dancing, less engineering precision maybe.

Finishing Touches

Once all the planks were down, it already looked a million times better. Removed the spacers. Then came the trim – the baseboards to cover the expansion gap around the edges. Cutting those angles for the corners, another test of patience. Used a nail gun for that, much quicker than doing it by hand.

Cleaned everything up. Swept, vacuumed, then wiped it all down. Stood back and looked.

It actually looked pretty damn good. Solid. Feels nice underfoot. Took a weekend, some sweat, a few sore muscles, and maybe one or two planks cut slightly too short (shhh), but totally worth it. Doing it yourself, you notice every little detail, every slight imperfection, but you also get that satisfaction. The “rubber dancing engineer” managed okay, I guess. Now, time to put all that furniture back…

Leave A Comment