Alright folks, gather ’round. Today’s project was a real doozy – figuring out this removable maple flooring for the volleyball court at our community center. Didn’t turn out quite like the pictures online, surprise surprise. Here’s how it went down.

The Starting Point: Why Bother?

Our old court surface? Basically sandpaper mixed with sadness. Players kept slipping, knees were getting wrecked, and nobody wanted to dive for the ball anymore. Needed something way better. We looked at permanent hardwood, but man, the cost and the fact the room gets used for other stuff? Nope. That’s when I stumbled on this “removable hardwood” idea online. Sounded almost too good.

Digging and Decisions

Started researching like crazy. Found maple kept popping up – said it was tough, gave good bounce, felt nice underfoot. Removable was key because:

  • Fundraisers and junk need that space cleared out sometimes.
  • No way could we afford a permanent pro court.
  • Figured if we screwed up installing one section, maybe we wouldn’t have to scrap the whole thing?

Looked at a few places, prices all over the shop. Settled on a supplier claiming “easy interlocking removable maple panels.” Paid the cash, crossed my fingers, waited for the truck.

Delivery Day Reality Check

Boxes arrived. Felt way heavier than I thought. Opened one up – damn, solid maple squares, each maybe 3ft by 3ft. Looked good! But then saw the locking system – these thick metal channels underneath. Instructions? A single page folded up, mostly diagrams. Already started sweating.

The Installation Circus Begins

Cleared the whole area – swept, mopped, let it dry bone dry. Grabbed two buddies (owed them beers big time later). Started laying out the first row along a straight line we snapped. Had to beat the panels together hard with a rubber mallet to get that locking mechanism to click. My arms were burning after like 10 minutes. Getting them perfectly aligned? Total pain.

Worse part was the edges. Where the panels met the wall, or around posts? Had to bust out the power saw. Cutting thick maple with a metal seam in it? Sparks flew, scared the heck out of us. Measured like three times, cut once, still felt wrong.

The Infamous “Lip”

Got maybe two-thirds done. Looked flat from across the room. Walked over it… THUNK. THUNK. Some panels sat higher than others. Not huge gaps, but enough you’d definitely trip over it. Drove me bonkers! Turns out the subfloor underneath wasn’t dead flat like the instructions assumed (ha!). We tried shoving thin wood shims under the low spots, hammering like crazy on the high spots. Made it a bit better, but never perfect. Biggest lesson learned right there.

Finishing and Testing

Finally got the whole area covered. Left a small gap around the edges like the manual vaguely suggested for “thermal expansion.” Sweated bullets hoping mother nature’s piss (rain) wouldn’t leak in from outside if we forgot the edges.

Brought in the team captains to test it. First reaction? Ooohs and aaahs because hey, wooden floor! Then they started passing a ball. Bounce was fantastic, everyone loved that. But moving around? Couple near misses on those slight lips we couldn’t fix. Took notes on where they felt the bumps most. Maybe I’ll go back with a sander for those spots later. Praying the panels won’t pop loose.

So, Is It Actually “Removable”?

Tried taking up one corner panel where we had a little leak. Honestly? It was tough! Needed pry bars and a lot of muscle to break the lock, worried we’d crack the wood. Got it up, dried things out underneath. Getting it back down perfectly flush? Let’s just say it involved more mallet abuse and some colorful language. It comes out, but it ain’t no picnic. Takes time and effort.

The Real Story Behind This Project

You wanna know why I spent weeks sweating over this specific project? Last summer, playing on that old brutal surface, I took a spill going for a dig. Wrecked my knee, popped it good. Laid on that concrete-like floor for ages waiting for help. Clinic visit, physio bills… sucked bad. Worse part? The center couldn’t afford a proper fix.

That injury cost me my weekend warehouse gig – just lifting stuff. Boss said “take all the time you need” which means “you’re fired, but nicely.” Savings drained fast paying rent. Felt useless. This court project? It’s me trying to make damn sure some kid, or someone’s mom who just likes to play, doesn’t eat the floor like I did. Doesn’t get stuck with the bills. That worn-out court felt like everything broken. Fixing a bit of flooring? Felt like maybe fixing a little part of something bigger I couldn’t fix for myself. Found a new, lighter job stocking shelves now while the knee gets better. And hey, maybe we’ll get that bounce just right before the season starts.

Leave A Comment