Okay, so let me tell you about this flooring project I tackled recently. It involved putting down some engineered wood planks, the kind that click together, you know? And I decided to put this rubber sheeting down first. Some folks call it an underlayment, I guess.

Getting Started – The Prep Work

First thing, like always, was cleaning up the old floor. It was just plain concrete, dusty as anything. Had to sweep it, then vacuum it real good. Did that twice, actually. You don’t want any grit under the new floor, makes it bumpy or noisy later on.

Then came the rubber stuff. It came in big rolls. Unrolled the first one along the longest wall. Had to trim it to fit the corners and stuff. Just used a utility knife, wasn’t too hard but you gotta be careful. Laid the next roll right beside the first one, making sure the edges touched but didn’t overlap. Some folks tape the seams, I did that too, used some kind of special tape for it.

Making sure that rubber layer was flat was key. No wrinkles, no big gaps. Took a bit of shuffling around.

Laying Down the Wood Planks

Alright, with the rubber base down, it was time for the wood. These were engineered boards, not solid wood, but they look pretty nice. They have these grooves and tongues on the edges so they just kinda snap together.

Started in one corner, like the instructions said. Put down the first row along the wall. Had to use these little plastic spacer things to keep a small gap between the wood and the wall. Apparently, wood floors need room to expand and shrink a bit with humidity changes.

  • Laying the first plank was easy.
  • The second one, you angle it, push it into the groove of the first one, then push it down flat. Click.
  • Just kept doing that along the wall.

When I got to the end of the wall, the last piece was almost always too long. So, had to measure it, mark it, and then take it outside to cut it with my saw. Cutting wasn’t too bad, just made a bit of a mess. Make sure you measure twice, cut once, right? Used the leftover piece from the cut to start the next row, usually. This staggers the joints, makes it look better and stronger.

The Tricky Bits and Finishing Up

It got a little tricky around doorways and weird corners. Had to do some more careful measuring and cutting for those bits. Sometimes you need to tap the boards gently to get them to lock tight. I used a little tapping block and a rubber mallet, nothing too forceful.

Row after row, click after click. It actually went faster than I thought once I got into a rhythm. Took me a weekend, pretty much. The last row was a bit like the first, sometimes needed cutting lengthwise to fit against the final wall, again leaving that small expansion gap.

Once all the planks were down, I pulled out those plastic spacers. The final step was putting down the trim, you know, the baseboards or quarter round, to cover up that gap around the edges and make it look finished. Nailed those into the wall, not the floor.

And that was it! Stepped back and looked at it. Felt pretty good, doing it myself. The floor feels solid underfoot, maybe that rubber layer helps. Looks way better than the old concrete, that’s for sure. Definitely a worthwhile bit of work.