Alright folks, gather ’round. Today’s project was a beast, I tell ya – finally tackling that worn-out basement floor and putting down proper hardwood sports flooring right here in Virginia. Been planning this for months, honestly.

So first thing this morning, coffee in hand, I stared down that ugly old concrete slab. Knew I needed that shock-absorbing layer underneath for any real basketball or pickleball action, right? Drove straight over to the big box store near Richmond, grabbed a whole stack of those thick rubber pads. Cost me way more than I thought it would. Gotta say, lugging those rolls down to the basement almost did me in before I even started. Sweating buckets already.

Got home and cleared the whole room out. Swept like crazy, got on my knees checking every inch for bumps or cracks in the concrete. Found a couple spots that needed leveling. Mixed up some self-leveling compound – messy stuff! – dumped it in the low spots and waited ages for it to dry solid.

Then came the real wrestling match: rolling out those giant rubber pads. Had to cut ’em to fit with a utility knife. Had to make sure every seam was tight, overlapped just right, taped down with the heavy-duty tape. It pissed me off how they kept wanting to curl back up. Needed to weigh down every edge with scrap wood and old paint cans for over an hour just to make it lay flat. Patience wore thin, believe me.

Okay, now for the stars of the show: the actual hardwood maple planks. Had ’em delivered last week, stacked up in the garage acclimating. Got my buddy Tom to come help carry ’em all downstairs – those suckers were heavy. Started clicking them together at the longest wall. Used a rubber mallet to tap the tongues and grooves tight. Had to keep checking the lines with a laser level every few rows. So important to get that starting row perfect, or the whole thing goes wonky.

Things were going okay until we hit the middle of the room. That’s when my mallet slipped. Whacked the edge of a plank HARD. Nearly threw my wrench across the room. Left a nasty little dent. Had to swap that plank out later. Around the door frame was another headache – intricate cuts with the jigsaw, my hands cramping up.

Finally got the last piece in as the sun was going down. Stood back, wiped the sawdust and sweat off my forehead. Still needed to nail in the transition strips at the doorway, felt satisfying pounding those suckers in.

Final touch? Swept everything clean, damp mopped it gently. Seeing that smooth, honey-colored maple surface under the basement lights… that was sweet. Can’t wait to chuck a basketball down there tomorrow. Was it worth it? The backache, the sweat, the cost? Seeing how much better it looks and feels compared to cold concrete? Yeah. Yeah, it definitely was.

Leave A Comment